BAKU GAS COMPRESSOR STATION

Location

Baku – Azerbaijan

Client

Azerigas Joint Stock Co.

Project Period

15 Months

Scope of Work

Turnkey construction of 355 each 400 mmx 400mm Rc pilling Works,3500 concrete Works, 11.000 m2 form Works, 275 mton steel construction, 17.000 m3 excavation & backfilling, 500 m3 asphalt pavbing Works and other electromechanical pump station installation Works.