29 January 2019
by Engn
BAKU GAS COMPRESSOR STATION
Location |
Baku – Azerbaijan |
Client |
Azerigas Joint Stock Co. |
Project Period |
15 Months |
Scope of Work |
Turnkey construction of 355 each 400 mmx 400mm Rc pilling Works,3500 concrete Works, 11.000 m2 form Works, 275 mton steel construction, 17.000 m3 excavation & backfilling, 500 m3 asphalt pavbing Works and other electromechanical pump station installation Works. |