400 MW COMBINED CYCLE POWER PLANT – SEVERNAYA
Location |
Baku – Azerbaijan |
Client |
Azer Energy |
Project Period |
23 Months |
Scope of Work |
Engineering Works, Civil & Electromechanical Installation Works, 100.000 m3 excavation & backfilling, 24.000 m2 pavement works. 1.500 m2 concrete Works for pump station. Generator building turn key construction, foundations of generators.Water intake system. Pump station and water outlet system. Sewage system and breakwater construction. Railway, 370 mtons gas tribune installation, 2.100 mton detonation & electrical system. 10.000 m3 stocking tank, 5.000 m3 fuel tank. |