29 January 2019
by Engn
CATHODIC PROTECTION OF GREATR MAN MADE RIVER
| Location | Sirte / Libya |
| Contractor | GMMRA |
| Project Period | 11 Months |
| Scope of Work | 50.826 each 8.9 m depth hole construction, installation of anodes, chemical liquid application construction of 1,5mx1,5m trench for 270 kilometer and other constructional works for the cathodic protection of pipeline. |

